Canada · CAD
ISO 9001 QMS
Cost Estimator
Enter your project inputs and complexity scores to get an accurate base cost, point estimate, and budget range — modelled directly from your Excel workbook.
1 Project Inputs
Select your organisation profile. Blue cells from the Calculator sheet.
2 Weighted Complexity Scoring
Score each category 1 (very low) to 5 (very high). Weights are from the Tables sheet.
10%
20%
20%
10%
10%
15%
10%
5%
3 Complexity Analysis
Normalized weighted score drives the complexity multiplier.
Normalized score:
Simple (0.20)
Medium (0.46)
Complex (0.71)
Very Complex (0.86+)
Complexity multiplier: —
Scope multiplier: —
Timeline multiplier: —
4 Cost Estimate
Formula: Base Cost × Complexity × Scope × Timeline
Base cost
—
CAD
Point estimate
—
CAD
Budget range — low
—
CAD (−10%)
Budget range — high
—
CAD (+10%)
5 Base Cost Build-up
Matches the Base Cost Build-up section of your Calculator sheet.
Component
Selected option
Basis
Cost (CAD)
Foundation cost
—
Fixed base (Tables sheet)
Employee add-on
Lookup: Employee Count Table
Sites add-on
Lookup: Sites Table
Processes add-on
Lookup: Core Processes Table
Documentation add-on
Lookup: Documentation Maturity Table
Internal lead add-on
Lookup: Internal QMS Lead Table
Base cost subtotal
Sum of all add-ons + foundation
Point estimate
Base × Complexity × Scope × Timeline
FORMULA (from Calculator sheet)
Base Cost × Complexity Multiplier × Scope Multiplier × Timeline Multiplier
⚠️ Certification body audit fees, travel costs, and major ERP / system integration are excluded from this estimate. Use the budget range — not the point estimate — for proposals and client quotes.