ISO 9001 QMS Cost Estimator
Canada · CAD

ISO 9001 QMS
Cost Estimator

Enter your project inputs and complexity scores to get an accurate base cost, point estimate, and budget range — modelled directly from your Excel workbook.

1 Project Inputs
Select your organisation profile. Blue cells from the Calculator sheet.
2 Weighted Complexity Scoring
Score each category 1 (very low) to 5 (very high). Weights are from the Tables sheet.
10%
20%
20%
10%
10%
15%
10%
5%
3 Complexity Analysis
Normalized weighted score drives the complexity multiplier.
Normalized score:
Simple (0.20) Medium (0.46) Complex (0.71) Very Complex (0.86+)
Complexity multiplier:
Scope multiplier:
Timeline multiplier:
4 Cost Estimate
Formula: Base Cost × Complexity × Scope × Timeline
Base cost
CAD
Point estimate
CAD
Budget range — low
CAD (−10%)
Budget range — high
CAD (+10%)
5 Base Cost Build-up
Matches the Base Cost Build-up section of your Calculator sheet.
Component Selected option Basis Cost (CAD)
Foundation cost Fixed base (Tables sheet)
Employee add-on Lookup: Employee Count Table
Sites add-on Lookup: Sites Table
Processes add-on Lookup: Core Processes Table
Documentation add-on Lookup: Documentation Maturity Table
Internal lead add-on Lookup: Internal QMS Lead Table
Base cost subtotal Sum of all add-ons + foundation
Point estimate Base × Complexity × Scope × Timeline
FORMULA (from Calculator sheet)
Base Cost × Complexity Multiplier × Scope Multiplier × Timeline Multiplier
⚠️ Certification body audit fees, travel costs, and major ERP / system integration are excluded from this estimate. Use the budget range — not the point estimate — for proposals and client quotes.